In page Ribble Valley line:

"

The NWR was absorbed by the Midland Railway (MR) in 1871, and once the MR began work on its Settle and Carlisle Railway, the LYR decided to resume work on the line north of Chatburn. This was authorised on 24 July 1871, and the 11 12 miles (18.5 km) were estimated to cost £220,000.[19] Construction north of Chatburn was resumed by the LYR in 1873, and was opened as far as Gisburn on 2 June 1879 although it was complete as far as Newsholme; the last section, between Gisburn and Hellifield, opened on 1 June 1880.[20]