Citation Hunt

The Wikipedia snippet below is not backed by a reliable source. Can you find one?

Click I got this! to go to Wikipedia and fix the snippet, or Next! to see another one. Good luck!

In page USS Lexington (CV-16):

"

The ship was laid down as Cabot on 15 July 1941 by Fore River Shipyard in Quincy, Massachusetts. In May 1942, USS Lexington (CV-2), which had been built in the same shipyard two decades earlier, was sunk at the Battle of the Coral Sea. In June, workers at the shipyard submitted a request to Navy Secretary Frank Knox to change the name of a carrier currently under construction there to Lexington.[1] Knox agreed to the proposal and Cabot was renamed as the fifth USS Lexington on 16 June 1942.[2] She was launched on 23 September 1942, sponsored by Mrs. Theodore Douglas Robinson. Lexington was commissioned on 17 February 1943, with Captain Felix Stump USN in command.