Citation Hunt

The Wikipedia snippet below is not backed by a reliable source. Can you find one?

Click I got this! to go to Wikipedia and fix the snippet, or Next! to see another one. Good luck!

In page Isaac Lee Patterson Bridge:

"

Construction of the bridge required the excavation of 10,174 cubic yards of earth and consumed 27,016 lineal feet of piling, 15,591 cubic yards of concrete, 1,764,981 pounds of reinforcing steel, and 114,109 pounds of structural steel.[3]